Posted in Projects on Mar 1st, 2010
Progress on our project has been huge in the last few weeks. Windows are almost completely installed…even the big glass on the front of the building is making great strides. One of the really neat aspects of this building will be all the natural light we will experience. We’ve used Low-E double paned windows to [...]
Read Full Post »
Posted in Projects on Jan 19th, 2010
Please pardon our mess…We’re salvaging the paneling from the lobby ceiling to reuse in our new lobby!
When we first started thinking about remodeling/building at our Southside branch, one of the items that came up regularly was the tongue and groove on the ceiling in the lobby. We all agreed it was too nice to just [...]
Read Full Post »
Posted in Projects on Dec 29th, 2009
From the outside, it might appear that progress on our building has come to a significant slow-down….however, there is a LOT going on inside the building! The interior walls are framed on the first floor 100% and the second floor about 80%. Window frames are starting to appear and glass should be following shortly. Speaking [...]
Read Full Post »
Posted in Projects on Nov 30th, 2009
The building has gone through a huge transformation in recent weeks. We now have exterior walls on the second floor and the clerestory (the big glass box on top of the building) is starting to take shape. We anticipate a roof in the next few weeks and the brick work continues. The concrete on the [...]
Read Full Post »
Posted in Projects on Oct 26th, 2009
If you’re like me, you may be arriving to work in the dark now and maybe even headed home in the dark! If that’s the case, you may miss some of the big things going on at the construction site…For instance, the brick on one entire wall is nearly completed! Check out the pix (taken [...]
Read Full Post »
Posted in Projects on Oct 5th, 2009
It’s been a couple of weeks since our last update and things have changed DRAMATICALLY on the site. We now have exterior walls going up, the concrete has been poured for the first floor and the firewall between the new building and the old one is rapidly taking shape. We’re hoping to have the [...]
Read Full Post »
Posted in Projects on Sep 15th, 2009
Things are moving VERY quickly on our construction project right now! Some of the main support columns have been installed (never fear, more are coming), all of the concrete for the walls and floor of the basement has been poured and the floor joists are in for the first floor. Right now, the iron workers [...]
Read Full Post »
Posted in Projects on Sep 2nd, 2009
We are moving into a very exciting phase of the construction project! The air handler will be lowered into the basement tomorrow morning (around 7:00-7:30) with a crane…not a sight to be missed! Visit us again later this week for pix of the installation.
Structural steel will start to go up later this week….and continue for [...]
Read Full Post »
Posted in Projects on Aug 21st, 2009
The studs are here! The studs are here! Well, at least some of our steel studs arrived early this morning for our construction project. This is our first official steel delivery with many more to come. Walls will be built on site and put into place with a crane. It will still be a couple [...]
Read Full Post »
Posted in Projects on Aug 11th, 2009
It’s been a while since our last construction update….while a LOT has happened, not much of it is readily visible as you drive by (except of course, “Mini Mount Sentinel”—someone suggested we paint a big “M” on our pile of dirt out front, Hmmmmm). Basement foundation and walls continue to be formed, poured, cured and [...]
Read Full Post »