From the outside, it might appear that progress on our building has come to a significant slow-down….however, there is a LOT going on inside the building! The interior walls are framed on the first floor 100% and the second floor about 80%. Window frames are starting to appear and glass should be following shortly. Speaking of windows…we’re using double pane, low-E windows to help minimize energy loss—windows are one of the biggest areas for heat/cooling loss on a building. The whole project was modeled to help choose the most efficient combination of design and materials (both economically and eco-consciously). This modeling included the HVAC system, insulation package, windows and exterior wall construction.

The temporary heat is on (which the guys working on site appreciate in a BIG way!) and electrical rough in continues. All the ductwork, conduits, and pipes that no one ever sees are being installed. The masons are making great progress on installing the 60,000+ bricks on the exterior…who knew there would be so many bricks! We can hardly wait to see them all without the scaffolding covering them up.

The schedule still looks pretty good for us to move into the new space in July. Once the new construction is completed and everyone moved from the old building, the remodel on the old building will start. The entire project is still on track to be completed this time next year.

We appreciate everyone’s patience with the mess of construction and the challenge of getting around the site. By this time next year, all this inconvenience will be but a vague memory! Here’s to 2010!

Leave a Reply

Any comments posted here will be public on our blog. Please do not post personal information or any content you do not want to be in public domain